Mission
- To provide Mass Rapid Transit System (MRTS) in the city of Jaipur by way of metro rail network.
- JaipurĀ Metro to be of world class standards in regard to safety, reliability, punctuality, comfort and user satisfaction.
- Metro to operate on sound ethical standard.
Network
Routes under construction
Currently, Green Line and Orange Line are being constructed. The implementation of Stage 1 of the project (Mansarover to Chandpole having the length of about 9.25 km) including the civil works, permanent way, depot and traction and power supply, etc. are to be executed by DMRC on turnkey basis. The AFC, telecom and signalling, and rolling stock of line completed in stage 1 is to be executed on PPP basis in Stage 2 along with the complete line of Corridoor-I (Ambabari to Sitapura), the remaining part of Corridoor-II (Badi Chaupar to Chandpole). Green Line (Mansarovar - Badi Chaupar)
Green Line (Mansarovar - Badi Chaupar)
The First route of Jaipur metro rail will connect Mansarovar to Badi Chaupar via Civil Lines and Chandpole. In Phase 1, the metro would run from Mansarovar to Chandpole. The construction has already begin and is expected to be completed by June 30, 2013.
Orange Line (Sitapura Industrial Area - Ambabari)
The Second route of Jaipur metro rail (north-south corridoor) will connect Sitapura Industrial Area in south to Ambabari in north via Ajmeri Gate and MI Road. The tracks will be elevated till Ajmeri Gate and then will go underground.
Sponsored Link
- Host Net India
Affordable Web Hosting Provider - The Pinnacle Group Inc.
Web solutions Provider - Host Net Mail
Bulk Mailing Solution Provider - MyVectorStore
Royalty Free Stock Icons - Evrsoft
Website Builder Software & Tools - Hosting In India
- Host Net Dubai